Maclay School, Beck Family Innovation Center
Construction Management at Risk (CMAR)
K-12 Education
Maclay School is PreK-12 college preparatory school and has introduced a transformative new educational iTHINK Research Center on its campus. iTHINK is defined as going beyond STEM and STEAM through a “transformative initiative catapulting our Classrooms, Curriculum, and Campus through.
Maclay School, Beck Family Innovation Center
Construction Management at Risk (CMAR)
K-12 Education
Capital City Consulting New Office Building
Construction Management at Risk (CMAR)
Commercial
The project consisted of one 2-story structure, bookended by two existing downtown buildings, encompassing 10,330SF of legal office space. The conceptual inspiration for the building developed in a direct response to the owner’s request for a sleek, transparent design prioritizing.
Capital City Consulting New Office Building
Construction Management at Risk (CMAR)
Commercial
The School of Arts & Sciences Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
The project consisted of sitework including demolition, utilities, grading, new retention pond, parent / bus loop, sidewalks and landscaping. It has a new twelve classroom pre-engineered metal building which is approximately 12,000 square feet.
The School of Arts & Sciences Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Leon County Schools John G. Riley Elementary School
Construction Management at Risk (CMAR)
K-12 Education
The John G. Riley Elementary School Project was a renovation and addition to the oldest elementary school in Tallahassee.
Leon County Schools John G. Riley Elementary School
Construction Management at Risk (CMAR)
K-12 Education
The Commons at Holy Comforter Episcopal School
Construction Management at Risk (CMAR)
K-12 Education
The new Commons Building was the fourth major construction project Ajax has completed on the Holy Comforter campus. At approximately 20,000 SF, The Commons includes a performing arts space and dining hall with a full service kitchen bringing the students.
The Commons at Holy Comforter Episcopal School
Construction Management at Risk (CMAR)
K-12 Education
Tallahassee Orthopedic Center New Clinic
Construction Management at Risk (CMAR)
Healthcare
Read about this project on page 11 in the Spring Issue of STOBG Insights MagazineGo to https://indd.adobe.