Syneos Health – Miami Expansion
Design Build
Commercial, Healthcare
This project is a two phase renovation of an existing Medical Office Building (MOB) in Miami, Florida for Syneos Health totaling approximately 9,300 SF. This renovation occurring on the 4th floor, where half the floor is fully occupied, includes creation...

Syneos Health – Miami Expansion
Design Build
Commercial, Healthcare
Okaloosa County Crestview Courthouse
Design Build
Government, Justice, Public Safety
Built in 1953, the original Okaloosa County Courthouse was no longer able to keep up with the growth and demands of the community. Ajax led the Design-Build team to replace the original courthouse with a new 68,000 SF facility. The...

Okaloosa County Crestview Courthouse
Design Build
Government, Justice, Public Safety
Pinellas County Schools Bussing Compounds
Construction Management at Risk (CMAR)
K-12 Education
49th Street Bus Compound The 49th Street Compound is a 10.81 Acre Site that has a new 25,000 square foot service building built to replace the existing service building on site. This building houses both the Service and Administrative functions...

Pinellas County Schools Bussing Compounds
Construction Management at Risk (CMAR)
K-12 Education
Duval County Public Schools Oceanway Middle School
Construction Management at Risk (CMAR)
K-12 Education
This project included the conversion of the existing Oceanway Elementary School site into a new Middle School with a student capacity of 1,200. The existing gym and music suite buildings were incorporated into the design of the new campus. The...

Duval County Public Schools Oceanway Middle School
Construction Management at Risk (CMAR)
K-12 Education
Pinellas County Central Energy Plant
Design Build
Government
This project consisted of the construction of a new 7,900 SF Central Energy Plant and associated site improvements. Ajax constructed this plant for Tampa Bay Trane, who is in turn providing this infrastructure to Pinellas County Government. It included construction...

Pinellas County Central Energy Plant
Design Build
Government
Orange County Public Schools Pine Hills Bussing Compound
Construction Management at Risk (CMAR)
K-12 Education
This design-build project consisted of new and replacement facilities for OCPS Fleet/Bus Maintenance, new North Learning Community Offices and new satellite Northwest Area Maintenance Offices on the existing 97-acre site. Major elements of the project included design and construction of...

Orange County Public Schools Pine Hills Bussing Compound
Construction Management at Risk (CMAR)
K-12 Education
College of Coastal Georgia Teacher Education & Learning Center
Design Build
Higher Education
The $7.4 million project provided a new 30,000 square foot classroom and laboratory facility to house the College’s growing teacher education programs, as well as the service-learning and student academic support programs. The new facility is comprised of state-of-the-art classrooms,...

College of Coastal Georgia Teacher Education & Learning Center
Design Build
Higher Education
Monroe County School District Key West High School Backyard Design Build
Construction Management at Risk (CMAR)
K-12 Education
The project was a design-build 6.4-acre sports complex replacement project including natural and synthetic sports fields and a rubberized track. The new sports fields include synthetic turf multi-use football/soccer/lacrosse field and synthetic softball field with batting cages and bull pens...

Monroe County School District Key West High School Backyard Design Build
Construction Management at Risk (CMAR)
K-12 Education
University of Florida Powell Structures Lab & Testing Center
Design Build
Higher Education, Technology
The University of Florida Powell Structures Lab is an Engineering test facility that was completed using the Design Build process with Long & Associates Architects / Engineers. The Powell Structures Lab is a one story enclosed building with approximately 8,565...

University of Florida Powell Structures Lab & Testing Center
Design Build
Higher Education, Technology
Sumter County Jail Expansion
Design Build
Government, Public Safety
The Sumter Jail will consist of a one-story, two level tilt panel housing pod building with a total gross square footage of 38,662. The building will have an inmate capacity of 256. Modular cells are included on all four (4) sides of the building at two (2) levels with a security mesh protection at the mezzanine level. There is a control room in the middle for observation and controlling the inmate population. The maintenance access is divided into a quadrant and includes a corridor for each housing pod. An enclosed fenced walkway extends from an existing building to connect to the new housing pod. Electrical renovations to the existing Bravo facility will also be included. CURRENT STATUS (as of 5/8/2020) Throughout the month of April; concrete tilt walls have been erected while patching and caulking is ongoing. Overhead rough-in for MEP is underway in preparation for behind modular cell mock-up. Installation of steel & decking has been completed. Installation of preliminary masonry block is in progress as delivery and install of modular cells are forthcoming. Building dry-in for main building has been completed and dry-in for lower roof is ongoing.