Ferman Countryside Ford
Construction Management at Risk (CMAR)
Commercial
Ferman Countryside Ford is currently building a new sales and service center in Clearwater, Florida. The project is being constructed by Ajax Building Company and is expected to be completed in Summer 2024.

Ferman Countryside Ford
Construction Management at Risk (CMAR)
Commercial
Syneos Health – Miami Expansion
Design Build
Commercial, Healthcare
This project is a two phase renovation of an existing Medical Office Building (MOB) in Miami, Florida for Syneos Health totaling approximately 9,300 SF. This renovation occurring on the 4th floor, where half the floor is fully occupied, includes creation.

Syneos Health – Miami Expansion
Design Build
Commercial, Healthcare
THE ADVOCACY GROUP AT CARDENAS OFFICE BUILDING RENOVATION
Construction Management at Risk (CMAR)
Commercial
The Advocacy Group project was a renovation of the first floor of an existing two story 11,000 SF office building. The renovation included all new mechanical equipment for the entire building, new façade, new canopy, demo and build out of.

THE ADVOCACY GROUP AT CARDENAS OFFICE BUILDING RENOVATION
Construction Management at Risk (CMAR)
Commercial
Trimark Properties Ingenuity Office Building
Construction Management at Risk (CMAR)
Commercial
Trimark intended to increase available office/research space within Innovation Square. Other than repurposed buildings, Innovation Square previously lacked any large office/research space to lease or purchase.

Trimark Properties Ingenuity Office Building
Construction Management at Risk (CMAR)
Commercial
Capital City Consulting New Office Building
Construction Management at Risk (CMAR)
Commercial
The project consisted of one 2-story structure, bookended by two existing downtown buildings, encompassing 10,330SF of legal office space. The conceptual inspiration for the building developed in a direct response to the owner’s request for a sleek, transparent design prioritizing.

Capital City Consulting New Office Building
Construction Management at Risk (CMAR)
Commercial
University of Florida Health Facilities Administration Building
Construction Management at Risk (CMAR)
Commercial, Healthcare, Higher Education
The University of Florida Health Facilities Administration Building and Generator Plant project consisted of a new standalone office building for Facilities Development at UF Health. A pre-engineered metal building was constructed to house the Facilities Administration Department offices.

University of Florida Health Facilities Administration Building
Construction Management at Risk (CMAR)
Commercial, Healthcare, Higher Education
Ajax House at Haven South
Construction Management at Risk (CMAR)
Commercial, Non-Profit, Residential
The empty Pinellas County Schools Harris TIPS School did not stay that way for long as it was the perfect vacant opportunity for Starting Right, Now to expand their resources from Hillsborough County into Pinellas County. It was also an.

Ajax House at Haven South
Construction Management at Risk (CMAR)
Commercial, Non-Profit, Residential
Tallahassee State Bank Branch Office
Construction Management at Risk (CMAR)
Commercial
This is a Design Build Project which included the construction of the new Capital Circle Tallahassee State Bank Branch, associated site utilities, the construction of a new turn lane off of Capital Circle and associated site work immediately adjacent to..

Tallahassee State Bank Branch Office
Construction Management at Risk (CMAR)
Commercial
Tallahassee Tapestry Assisted Living
Construction Management at Risk (CMAR)
Commercial, Healthcare
Tapestry Tallahassee (the “Project”) was the conversion of a four story building constructed in 2003 to a 105 unit assisted living facility. An attached new addition was constructed for a 44-unit memory care facility, which included space for physical rehabilitation.

Tallahassee Tapestry Assisted Living
Construction Management at Risk (CMAR)
Commercial, Healthcare
Governor’s Marketplace
Construction Management at Risk (CMAR)
Commercial
Ajax was contracted for this extensive sitework package with over 200,000 cubic yards of soil to move on a new 40-acre site. There was also a large earth berm and temporary holding pond constructed.
