Hillsborough County Robinson High School, Referendum Year 3
Tampa, FL
Construction Management at Risk (CMAR)
K-12 Education
This project consisted of a partial campus replacement with new classroom and administration buildings of 89,000 SF, a new chilled water plant and campus-wide HVAC system upgrades with associated architectural upgrades on 156,160 SF of existing buildings including new windows, ceilings,..
Hillsborough County Robinson High School, Referendum Year 3
Tampa, FL
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools Witter Elementary Renovations
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools contacted Ajax to request assistance with a project that was just getting ready to start where the selected CM was having difficulty obtaining the necessary bonding. This project included HVAC equipment replacement, flooring replacement, limited new.
Hillsborough County Public Schools Witter Elementary Renovations
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools Sumner High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
This project consisted of a 2-story addition of 26,000 SF for approximately 600 students (Building 9). The construction included tilt-wall exterior panels, structural steel frame columns, beams and metal deck at 2nd floor and roof level, light weight insulating roof.
Hillsborough County Public Schools Sumner High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools Alonso High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
This project consisted of a single-story 12 classroom building addition and renovations to the Cafeteria, ESE, and Administration buildings. The renovations covered a total of 20,792 square feet.
Hillsborough County Public Schools Alonso High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools East Bay Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
The scope of this project included the addition of two new classroom buildings each with 10 classrooms. One building now functions as a hurricane shelter and were built to EHPA requirements.
Hillsborough County Public Schools East Bay Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Public Schools Robinson High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
The project consisted of an 12,897 SF, single story, 12-classroom addition to the existing Robinson High School campus and a new parking lot with Driver’s Education course. The building was designed to incorporate campus architecture themes with brick facades and.
Hillsborough County Public Schools Robinson High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Spoto High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
The Spoto High School Classroom Addition project consisted of a 20 classroom, 2 story concrete tilt wall addition on an occupied campus along with with a campus wide HVAC system upgrade. The 31,031 SF addition houses general classrooms, Chemistry and.
Hillsborough County Spoto High School Classroom Addition
Construction Management at Risk (CMAR)
K-12 Education
Hillsborough County Schools Memorial Middle School, Referendum Phase 2
Construction Management at Risk (CMAR)
K-12 Education
The Memorial Middle School Referendum Phase 2 project consisted of renovations to Buildings 1 and 6 and the entire campus for security and HVAC upgrades. The project was funded from the 1% sales tax referendum for Hillsborough County.