This project involves the construction of a new single story Emergency Operations Center. The $9.5 million facility is being funded with a state grant from the Florida Division of Emergency Management to replace the current building which failed during Hurricane Ian in 2022.
The exterior walls will be constructed with 12-inch cast-in-place concrete and rated to withstand winds from a Category 5 hurricane. The new facility will include a situation room, two breakout rooms, a public lobby, press room, administrative offices, workspaces, restrooms, logistics storage, radio area and a GIS space. An emergency generator will also be installed on site to fully power the facility once electrical services are cut due to an approaching storm.