back Button
Lake County Schools Mount Dora High School - Ajax Building Company
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
37684
projects-template-default,single,single-projects,postid-37684,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-6.4.1,vc_responsive
Slide background
Slide background
Slide background
Slide background
project

Lake County Schools Mount Dora High School

The Mount Dora High School Renovations project was a multi-phased 22-month project. Base bid work consisted of three (3) two-story classroom buildings, a Media Center, Band & Choral Auditorium, Gymnasium, two-story Administration and New Cafeteria & Culinary Arts Buildings. The 3 Classroom Buildings and the Administration Building all connect together with a 2nd story walkway that includes a bridge from one part of the campus to the other, over a main street.

Client

Lake County School Board

Location

Mount Dora, FL

SF

185,353

Architect

C.T. Hsu & Associates