skip to main content
back Button
FAMU Foster Tanner Complex - Ajax Building Company
Structure Tone is a global leader in construction management and general contracting services with offices located in the US, UK, and Ireland. Founded in 1971, the company is among the world’s top twenty construction companies worldwide, responsible for more than $3.5B in annual construction volume.
37500
projects-template-default,single,single-projects,postid-37500,mkd-core-1.0.2,ajax_fade,page_not_loaded,,onyx child-child-ver-1.0.0,onyx-ver-1.4.1, vertical_menu_with_scroll,smooth_scroll,side_menu_slide_with_content,width_470,wpb-js-composer js-comp-ver-6.4.1,vc_responsive
Slide background
Slide background
Slide background
project

FAMU Foster Tanner Complex

At 89,864 SF, the Foster Tanner expansion and remodeling was an integral part of the Florida A&M University campus master plan. The project was the first step in the development of a central academic core for Arts and Sciences and the first step in creating a centrally located university parade ground.

Work at the Foster Tanner complex was phased and conducted near the heart of campus, busy with student activities. The work included remodeling and re-configuring the existing fine arts facility; upgrading the fine arts facility to meet program requirements; and, finally, new construction of a band building.

Client

Florida A&M University

Location

Tallahassee, FL

SF

89,864

Architect

Johnson Peterson Architects