Hover Effects College of Charleston McAlister Hall Renovation
College of Charleston McAlister Hall Renovation
Construction Management at Risk (CMAR)
Higher Education
This project consisted of the renovations of the existing six story 145,599 SF McAlister Hall residence facility. There are 127 units, 536 beds, and 10 different suite types: A (95 units), B (5 units), B1 (1 units), C (5 units),.
College of Charleston McAlister Hall Renovation
Construction Management at Risk (CMAR)
Higher Education
Hover Effects College of Charleston Rutledge Rivers Dormitory Renovations
College of Charleston Rutledge Rivers Dormitory Renovations
Construction Management at Risk (CMAR)
Higher Education, Residential
This project consisted of renovating and abating an existing 1970’s dormitory building which is four stories tall and approximately 28,000 square feet. The new dormitory sleeps 109 students, with custom wood sleeping pods including integral desks and shelving.
College of Charleston Rutledge Rivers Dormitory Renovations
Construction Management at Risk (CMAR)
Higher Education, Residential
Hover Effects College of Charleston Sottile Theatre Renovation
College of Charleston Sottile Theatre Renovation
Charleston, South Carolina
Construction Management at Risk (CMAR)
Cultural, Higher Education, Historic Restoration
The Sottile Theatre at the College of Charleston was originally built in 1927 as the state’s largest theatre.This renovation will include not only the stage, but the backstage areas as well to improve the quality, safety, and efficiency of the space.