|
PROJECT DESCRIPTION:
The Mt. Dora High School Renovations project was a 185,353 SF, multi-phased 22-month project. Base bid work consisted of three (3) two-story classroom buildings, a Media Center, Band & Choral Auditorium, Gymnasium, two-story Administration and New Cafeteria & Culinary Arts Buildings.
The 3 Classroom Buildings and the Administration Building all connect together with a 2nd story walkway that includes a bridge from one part of the campus to the other, over a main street. Only one building from the existing campus remains after demolition.
|