|
PROJECT DESCRIPTION:
The project will consist of replacing all existing Portico slab, entry steps and sidewalks. Installing new exterior stucco and resealing exterior precast panels. Install new exterior windows and doors. Install a new sloped metal roof.
CURRENT STATUS (5/1/12):
The East and South Portico Slab are complete. The East Steps are complete and work on the South Steps is 50% complete. Installation of the new rain water piping is 85% complete.
|